ACS is now providing multiple testing and monitoring services for the new AirTrain expansion at San Francisco International Airport.
ACS has begun testing of production piles for Construction Package 4 of the California High Speed Rail
Production of pile foundations for several bridges has begun in Bakersfield, Ca and Wasco, Ca for the next phase of the California High Speed Rail. ACS Inc. has been contracted to supply the testing services for these piles.
ACS has begun testing for 5th St bridge near Yuba City
Construction and testing has begun on a new bridge for 5th street between Yuba City and Marysville. The project consists of 10 bents with three 10 foot piles each.
ACS has begun testing for Phase 4 of the new California High Speed Rail
ACS has been awarded the contract for pile testing for the next phase of the high speed rail project. This section will begin in Bakersfield and work south.
Happy Thanksgiving
ACS offers Thermal Integrity Profiling (TIP) testing
ACS, Inc. now offers Thermal Integrity Profiling testing for drilled CIDH and Auger-Cast piles. This non-destructive test can be offered as an alternative or addition to both CSL and GGL testing.
ACS has begun testing piles for CalTrain track expansions in Los Gatos
ACS Inc has been contracted to provide testing for piles drilled by Malcolm Drilling for new bridges and track expansions for both CalTrain and UPRR in Los Gatos.
ACS, Inc. has a new drop hammer available for rental and has already to test several jobs with auger-cast piles
ACS has recently acquired its own proprietary drop hammer (shown below) for use in conjunction with pile dynamic analysis to measure integrity and capacity of a variety of types of piles.